*projects completed with Tellepsen Builders in the role of Project Manager or Superintendent
projects completed with Manhattan Construction
¤projects completed with Vaughn Construction

89,000 sq.f, 109+ million renovation/addition, 4.5-year construction program of 500,000 sq.f of classroom, library, administration offices , natatorium, gymnasium, and football practice fields.
89,000 sq.f, 109+ million renovation/addition, 4.5-year construction program of 500,000 sq.f of classroom, library, administration offices , natatorium, gymnasium, and football practice fields.
75,000 sq.f new construction of sanctuary & education buildings.
Expansion of the existing wood framed Sanctuary to add 2,500 sq.f for seating including audiovisual equipment, plaza expansion, and chiller yard expansion and reworking the existing MEP system.
Two stories new construction with 31,611 sq.f administration building and one story 15,948 sq.f learning center. Included site development including parking for 160 spaces, sidewalks, pavilion, and covered walkway.
Complete renovations of a 5,500 seat worship center, a new stage platform, replacement of the copper dome roof, acoustic ceilings, skylight, a cry room and restroom remodel.

  • SBC Woodway Business Offices* 3,000 sq.f Remodel and relocation of Finance, Administration & HR Departments.
  • SBC Woodway Media Center* 4,000 sq.f Remodel of the studio, video & audio production, editing suites and tech spaces.
  • SBC Woodway Girl Theater (CM@R) * 4,000 sq.f Remodel of preschool ministry performance space with high-end finishes and substantial production scope including audio, video, lighting & sound controls and control room.
  • SBC “Woodway Village Renovation” * 6,000 sq.f Renovate existing shopping center to educational classrooms, restrooms, and multi-purpose spaces.

Axis Builders

44,000 sq.f new construction with 1,480 seat sanctuary, 250 seat chapel, orchestra loft, central plant expansion and tie-in into the existing building. The construction is a structural steel frame, brick and plaster veneer.

Trinity-Lutheran-New-Sanctuary

30,000 sq.f new construction of an education building, including science labs and music room. 45,000 sq.f renovation of existing education building, including converting existing space into an auditorium.
16,000 sq.f new construction with 300 seats sacramental chapel, education building, multiple courtyard parking lots and central plant.

prince-of-Peace-Education-Building

30,000 sq.f demolition and complete build back including remediation.
  • Katy ISD Cinco Ranch Auditorium – 20,000 sf – fixed seating for 900 people.
  • Katy ISD Cinco Ranch 9th Grade Center – 95,000 sf – classrooms, science labs, gym and cafeteria.
  • Katy ISD Cinco Ranch Junior High #8 – 145,000 sf – classrooms, library, cafeteria and gym.
Interior renovation of a 3,335 seat and 43,892 sq.f worship center with a five-month construction schedule, including significant demolition of previous ceiling catwalks and installation of multiple new catwalks. Updated seating, ceilings, finishes lighting and reconfiguration of the choir and music areas.
165,000 sq.f interior build-out including offices consisting of executive offices, cubicles, full day care facility with a playground, fitness center with lockers and a loading dock.
Owners Representative: bleacher, lighting improvements, and sidewalks.
Six stories, 93,000 sq.f poured in place hotel with brick exterior, featuring 129 extended stay suites, swimming pool, hearth room, meeting rooms and a full-service kitchen.
106,000 sq.f library building featuring a 58-foot tall rotunda and containing the presidential archives, a museum, and an orientation theater.
Three stories, 142,000 sq.f building housing classrooms and offices.
42,000 sq.f facility containing 600 seat and 300 seat auditoriums, a 500 person meeting room, The Center for International Studies, The Bush Foundation offices, public exhibit space, and an apartment for President and Mrs. Bush while on campus.
Three story cast-in-place concrete building features a large atrium and contains large classrooms, auditoriums, numerous laboratories and office space.
Eight level, 1 million sq.f poured-in-place concrete parking garage for approximately 2,500 cars, a baggage tunnel from the FIS building, new arrival and departure level roadways, and a seven-lane toll plaza.
Construction of a 1000 foot long cast in place concrete utility tunnel to Terminal E containing hot and chilled water and communications cabling.
100,000 sq.f facility consisting of 7,000 sq.f of office space, 25,000 sq.f of electrical and support space and one 76,000 sq.f computer room.
Twenty-one-story, 800,000 sq.f cast-in-place concrete structure containing legal staff and support offices, forty-one new courtrooms with a central secure holding area for prisoner containment.
1.4 million sq.f, 450 bed replacement facility is comprised of a seven-story teaching hospital with 18 surgical suites, 3 obstetric labor/delivery rooms, 4 research surgery suites, 22 radiology rooms, adjoining clinical and logistical support, MRI unit and a linear accelerator.
Two level, 73,000 sq.f poured-in-place concrete structure containing restaurants, deli bar, bar, retail shops, kitchen and administrative office spaces for servicing and entertaining the riverboat casino customers and a four-story 270,000 sq.f pre-cast garage with a capacity of 931 cars.
Pavilion featuring a restaurant, bar, kitchen, food court and administrative areas for entertaining Riverboat Casino customers, and a three level pre-cast parking garage to accommodate 750 vehicles.
Three story building with 100,000 sq.f of exhibit space, 94,000 sq.f of meeting and ballroom space, 123,000 sq.f of service and administrative support area, and 200,000 sq.f of parking and outdoor terrace areas. In addition to the building proper, the overall project required the development and construction of two adjacent plazas, the realignment of the existing front-street and construction of a sky bridge to the City’s existing parking garage.
Remodel and retrofit of the existing Turbine-engine overhaul building on American Airline’s maintenance base.