Clay Road Baptist Church

Houston, TX

Axis Builders, in conjunction with Mark Todd Architects, was blessed with the opportunity to build back the existing 30-year-old student building that flooded due to an existing fire sprinkler pipe freezing. The scope of the work included reconfiguring walls to create a new lobby/ check-in area featuring a new check-in desk, reconfiguring the existing restroom to comply with ADA standards, updating the finishes throughout, and installing casework throughout as required. Additional scope included bringing the existing electrical and fire alarm system up to the current code as well as miscellaneous exterior repairs. The project was completed in February ’23.